Industrial Metal ReRoof
Re-roof and enclosure at an active Transfer Station building at a Waste and Refuse facility.
Interior improvements included major tipping floor repairs, remove and replace 10 ft. push walls with 15 ft. push walls, and bathrooms.
Engineering design for AQMD Rule 410 Compliance, including ventilation and control system.
Worked flexible shifts with ongoing operations to maintain an active job site.