Commercial Building Construction
The commercial building construction involves the preparation of the site for the concrete pour. The men are digging foundations, installing rebar, and forming the slab.
The commercial building construction involves the preparation of the site for the concrete pour. The men are digging foundations, installing rebar, and forming the slab.
Facility Builders & Erectors crew is installing the structural steel entrance. The prefabricated metal building is customized with a canopy over the entrance.
FB&E erection team is in process of installing the roof sheet over the main crane runway for the commercial steel building. The crew will seam the metal sheet together for a flawless finish.
Facility Builders & Erectors crew erects the secondary structural framing members on the pre-engineered metal building.
The initial stages of construction of the office and warehouse building are in process. The concrete crew is putting the finishing touches on the concrete slab. FBE specializes in commercial construction.
Facility Builders metal building erectors work on the wall sheeting operation for the two-story office building. The team carefully place the wall sheets for perfect alignment.
Equipped in their safety gear the steel building erectors assemble the pre engineered steel church. Facility Builders erection crew is installing the hip pans on the custom eave canopy for a steel church building.
The Facility Builders steel building erectors assembles a steel building with clear spans for an 80-ton overhead crane runway. Pre engineered steel buildings allow for the large spans that are required for industrial buildings.
The pre fab metal building exhibits a customized eave canopy. Facility Builders & Erectors installs the steel pieces for the church.
FB&E completes the standing seam roof system over the upper gymnasium. The church metal building frame is erected and ready for the next phase.
Facility Builders erected the state of the art maintenance garage featuring a truck washing system, service pits and fueling stations. The service garage is adjacent to an 8,000 square foot administration office.
The in-patient care facility interior hallway showcases wood finishes and Guldmann Equipment. The house includes a laundry room, kitchen, living room, and five bedrooms.